The proposed upgrade of the pacific highway between Karuah and Buladelah involves the construction of two carriageways and removal of part of the existing carriageway along the pacific highway between a point about four kilometres north of the Karuah bridge and a point about 1.5 kilometres south of the Myall River bridge at Buladelah. The upgrade would be 36.75 km long and its estimated cost is $200 million. Working papers: 7. Aquatic. fauna and habitat assessment -- 8. Soils and geology assessment -- 9. Visual and landscape assessment -- 10. Consultation